26 окт. 2025 г., 20:48:37
Work on the nuclear facility was scheduled to begin in 2026
Work on the nuclear facility was scheduled to begin in 2026
NK-14ST engines are capable of operating effectively in the high-temperature conditions characteristic of Central Asia
The "Tabasco"-colored car was presented at "Innoprom" in Tashkent
Power units were shown at the "INNOPROM. Central Asia" exhibition
Rostec to Bring the Latest NK-14ST Gas Turbine Engine, Tu-214 and MS-21 Aircraft to Uzbekistan